MFV Anders Nees

The MFV Anders Nees was taken up on the Synchrolift from 4/2/14 and had the following works done before it went back into the water on 19/2/14. Jobs included:

  • Stripped guiding on gear on winches, then made new gear and replaced.
  • Fitted bilge pump in engine room
  • Fitted new sheaves for a new counting system on winches and fitted new bushings on existing sheaves
  • Removed rudder and rudder shaft, machined down and replaced all bushings
  • Jotun and Clarke paint system applied by Gerrard Bray

Comments are closed.