MFV Velvet Chord II refurb and repaint

We recently had the Velvet Chord II up for some extensive refurbishments and a brand new paint scheme. Works carried out are as follows:

  • Piped all diesel vents to join the tanks
  • Fitted new nozzle
  • Fabricated and fitted new limpets
  • Fitted Baffle in daily service tank
  • Fitted and piped pump in engine room for ice making
  • Fitted and welded brackets on mast for V-Sat and radars
  • Made brackets for cameras & speakers
  • Piped new diesel filter in engine room
  • Wash and new paint system from Jotun
  • Fitted anodes
  • There was a multitude of various small jobs also completed

Have a look at the gallery and video below

Comments are closed.