Constructor B up for works at Mooney Boats Ltd.

  • Vessel Lifted out of the water on Boathoist
  • Engine room gooseneck vents repaired/replaced
  • New non return flaps on the Auxiliary engine exhaust
  • Hatch seals replaced on both deck hatches
  • Valves on deck-wash deck manifold replaced
  • Fuel pipes replaced
  • Starboard stern tube lubricating pipe upgraded
  • Manual bilge pump relocated
  • Supplied & fitted engine room fire alarm
  • Manual fire pump repaired
  • Fitted new co2 system & locker

Comments are closed.