Constructor B up for works at Mooney Boats Ltd.
- Vessel Lifted out of the water on Boathoist
- Engine room gooseneck vents repaired/replaced
- New non return flaps on the Auxiliary engine exhaust
- Hatch seals replaced on both deck hatches
- Valves on deck-wash deck manifold replaced
- Fuel pipes replaced
- Starboard stern tube lubricating pipe upgraded
- Manual bilge pump relocated
- Supplied & fitted engine room fire alarm
- Manual fire pump repaired
- Fitted new co2 system & locker