The MFV Margaret Mary

We had a new visitor to the yard, the MFV Margaret Mary. While at the yard we did the following jobs:

  • Removed, reconditioned, refitted all shipside valves (crew)
  • Repaired opening windows in wheelhouse
  • Repaired Skippers Chair
  • Made and fitted life ring holder
  • Modifications to fish hold ladder
  • Made and fitted new pipe brackets on forepeak bulkhead
  • Fitted new valve on collision bulkhead and emergency shut off handle
  • Fitted new steel combings and lids in forward tanks
  • Fitted new toggles and handles in various doors and hatches
  • Renewed emergency bilge shut off cables
  • Made new stainless steel pipe in engine room
  • Repaired diesel sight glass on tank
  • Repaired rubber seals on various scuppers
  • Fitted new aluminium pawn boards in fish hold
  • Fitted 80mm insulation and 100mm of concrete in fish hold floor
  • Fitted various stainless steel flashing around door in fish hold
  • Washed, painted and new anodes supplied and fitted
  • Lift test on shaft.
  • Refurbishment to galley
  • Refurbishment on propeller
  • Ultrasonic hull inspection

Comments are closed.