B44 Stella Nova Week 36 2017

A look inside the B44 Stella Nova where this week we saw lots of pipework being completed in the engine room, as well as the wheelhouse panelling starting to take shape. Another thing to note from the pictures below is the amount of wiring going on. At this point in the build we see lots of pipework being done especially in the engine room, which is a lablour and time expensive part of the job, as all the pipework is only tacked in place before being removed from the boat, then welded fully in the yard before its replaced back where it was originally laid.

Comments are closed.